4 were rated high or medium-high risk. All were marked corrected. Texas HHSC inspections since 2021.
Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months: The last fire inspection was conducted on 10/2023.
Documentation of Drills: There is no documented fire drills for the month of October. This was corrected when the director documented the date of the fire drill.
Posting of Activity Plan: The activity plans have not been posted.
What parents say online, cameras, food and extra costs, tuition, teacher turnover, your drop-off and pick-up traffic, plus the full record — researched, reviewed by a person, delivered by email.
| Date | Inspection | Result | Findings | Open | Evidence |
|---|---|---|---|---|---|
| Nov 3, 2026 | Inspection | Deficiencies cited | 1 | 0 | Verified |
| Nov 19, 2025 | Inspection | No deficiencies cited | 0 | 0 | Verified |
| Nov 3, 2025 | Inspection | Deficiencies cited | 3 | 0 | Verified |
| Nov 4, 2024 | Inspection | Deficiencies cited | 3 | 0 | Verified |
8 answers need research — reviews, parent groups, the program’s website and traffic data. The report finds them for Katy Isd East Transportation.
Unlock — $12“Public record” rows come from state datasets. Missing information never means there is no issue.
Distilled into recurring themes, with dates and sources.
Unlock in the reportHistorical traffic at opening and closing, from every direction.
Unlock in the report| Nov 8, 2023 | Inspection | Deficiencies cited | 1 | 0 | Verified |
| Nov 17, 2022 | Inspection | Deficiencies cited | 1 | 0 | Verified |
| Feb 25, 2022 | Assessment | Deficiencies cited | 1 | 0 | Verified |
| Dec 1, 2021 | Inspection | No deficiencies cited | 0 | 0 | Verified |
Each finding links to its normalized violation type (all facilities with the same finding) and to the exact inspection.
| Date | Code | Severity | Status | Finding (source text) |
|---|---|---|---|---|
| Nov 3, 2026 | §746.5101(a) Fire safety & emergency drills | High risk | Corrected | Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months: The last fire inspection was conducted on 10/2023. |
| Nov 3, 2025 | §746.5205(4) Staff qualifications & clearances | Medium risk | Corrected | Documentation of Drills: There is no documented fire drills for the month of October. This was corrected when the director documented the date of the fire drill. |
| Nov 3, 2025 | §746.2209 Records, permits & program | Medium risk | Corrected | Posting of Activity Plan: The activity plans have not been posted. |
| Nov 3, 2025 | §746.201(7) Supervision & ratios | Medium risk | Corrected | Operation Open to Parents At All Times: There is a note on the entrance door stating that parents will not be permitted inside the building without an appointment. This was corrected when the director removed the posting. |
| Nov 4, 2024 | §746.2203(a) Facilities & equipment | Medium risk | Corrected | Written Activity Plans: There is no written activity plan posted in the classrooms. |
| Nov 4, 2024 | §746.5101(a) Fire safety & emergency drills | High risk | Corrected | Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months: The fire inspection expired on 10/20/2023. |
| Nov 4, 2024 | §746.1315(b) Staff qualifications & clearances | Medium-high risk | Corrected | Each Caregiver and the Director Must Have Current Training in pediatric CPR: 1 out 8 caregivers did not have CPR first aid. Caregiver start date ws March 2024. |
| Nov 8, 2023 | §746.1111 Staff qualifications & clearances | Medium risk | Corrected | Education Outside of U.S.: One employee did not have the high school diploma translated into English. |
| Nov 17, 2022 | §746.5101(a) Fire safety & emergency drills | High risk | Corrected | Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months: The annual fire inspection document was unavailable for review, and the current one expired on 01/15/2021. |
| Feb 25, 2022 | §746.303(b) Staff qualifications & clearances | Medium-low risk | Corrected | Report Number of Employees: A review of the Employees Who Left Employment in 2021 data from February 23, 2022, revealed that the center had not reported the number of employees who left employment in 2021 by February 22, 2022, as required. |
| Facility | Type | Operator | Capacity | Inspection findings | Last insp. | Dist. |
|---|---|---|---|---|---|---|
| Club Busy Bee - Mayde Creek Houston, 77084 | School-age program | — | 60 | No records | — | 1.0 km |
| Astra Academy Houston, 77084 | Child care center | — | 77 | No records | — | 1.1 km |
| Star Kiddos Child Care Center Houston, 77084corrective action | Child care center | — | 85 | No records | — | 1.3 km |
| Schmalz Elementary YMCA Houston, 77084 | School-age program | — | 40 | No records | — | 1.7 km |
| The Goddard School Houston, 77084 | Child care center | — | 156 | No records | — | 1.8 km |
| Kidco Learning Center Katy, 77449 | Child care center | — | 76 | No records | — | 2.6 km |
| Source | Record | Facts | Evidence | Effective | Retrieved |
|---|---|---|---|---|---|
| Texas HHSC Operations TX | 102543 | name, type, status, capacity, ages, hours, address, phone, subsidies | Verified | — | Nov 5, 2026 |
| us_census_geocoder US | 2901 DULANEY RD|HOUSTON|TX|7… | location Census Geocoder Exact match: 2901 DULANEY RD, HOUSTON, TX, 77084 | Verified | — | Nov 5, 2026 |
| tx_twc_subsidy_providers TX | 220830 | tx_rising_star_rating, accepts_cc_subsidy | Verified | Mar 1, 2025 | Nov 6, 2026 |
| Texas HHSC Inspections | 905749959 | Verified | Nov 3, 2026 | Nov 5, 2026 | |
| Texas HHSC Inspections | 905749958 | Verified | Nov 19, 2025 | Nov 5, 2026 | |
| Texas HHSC Inspections | 905749957 | Verified | Nov 3, 2025 | Nov 5, 2026 | |
| Texas HHSC Inspections | 905749956 | Verified | Nov 4, 2024 | Nov 5, 2026 | |
| Texas HHSC Inspections | 905749955 | Verified | Nov 8, 2023 | Nov 5, 2026 |
Sources: Texas HHSC Operations, us_census_geocoder, tx_twc_subsidy_providers. Missing data never means no issue exists. Report a correction.